Dear All,
As we know BPC 10.1 is going to be released very soon.
BPC 10.1 has two environment types
1. Classic (inherited from BPC 10.0)
2. Unified (based EDW data model)
Note :Environments with both types can co-exist on the same BPC System
This Documentation is for Migration from BPC NW versions to BPC 10.1(Unified and Classic)
1 | BPC 7.5 NW--> | BPC 10.1NW Classic ONLY |
2 | BPC 10.0 NW--> | BPC 10.1 Classic ONLY |
3 | BPC 10.0 NW--> | BPC 10.1NW BPC/PAK only |
4 | BW-IP/PAK--> | BPC 10.1 BPC/PAK only |
5 | BPC 7.5/10.0 NW--> | BPC 10.1 Classic and PAK Unified Mixed |
1 | BPC 7.5 NW--> | BPC 10.1NW Classic ONLY |
* Backup environment from BPC 7.5NW and restore to BPC 10.1 NW (Optional, only for two box upgrade scenario).
* Run Migrate program UJT_MIGRATE_75_TO_101 to migrate environment to be 10.1 ready.
* Manual adjust task profiles for new tasks and different task granularity between 7.5 and 10.1
* Migrate 7.5 EVDRE reports to 10.1 EPM Add-in reports.
* Adapt Badi implementations and other customer ABAP codes with new internal APIs of 10.1
2 | BPC 10.0 NW--> | BPC 10.1 Classic ONLY |
* Backup environment from BPC 10.0NW and restore to BPC 10.1 NW (Optional, only for two box upgrade scenario).
* Run Migrate program UJT_MIGRATE_75_TO_101(migrate resources used to store in BUI Layer to 10.1 web repository)
3 | BPC 10.0 NW--> | BPC 10.1NW BPC/PAK only |
* Backup environment from BPC 10.0NW and restore to BPC 10.1 NW (Optional, only for two box upgrade scenario).
* There is no existing tool can migrate BPC 10.0NW environment to 10.1 PAK Unified automatically
Following area need to manually rebuilt:
* Create EDW Model or use existing EDW model inside BW and Create 10.1 unified environment in BPC
* Move master data and transaction data via BW Tools
* Create teams and do other security setting and assignment in NW backend.
* Set work status and move work status locking data from 10.1 to 10.1 unified tables
* Enable data audit, data audit logs from 10.1 cannot be moved to 10.1 unified
* Set up BPF Templates, existing BPC Instance from 10.0 cannot move to 10.1 unified.
* Build FOX script to replace BPC Logic script
* Build up planning function in BW
* Build BEx Queries
* Build EPM Add-in/Web reports/Input forms based on BEx Queries
* Implement BW-PAK Badi
Below featured are not available in BPC 10.1 PAK unified
* Comment
* Activity Audit
* Data Manager
* Consolidation (Control, Journal, Business rules, control and consolidation monitor)
* Member formula.
4 | BW-IP/PAK--> | BPC 10.1 BPC/PAK only |
* Set up BPC Environment/Model on top of existing EDW model in BW
* Add User/team attribute of work status and BPF
* Create BPF template and start BPF Instance
* Enable work status if needed
* Enable data audit if needed
* Create new reports with EPM add-in or web client based on existing BEx Query
5 | BPC 7.5/10.0 NW--> | BPC 10.1 Classic and PAK Unified Mixed |
* For customers use both BPC Classic and PAK Unified with 10.1
* Migrate BPC 7.5/10.0 NW to BPC 10.1 Classic as mentioned with upgrade path 1 and 2.
* Create planning scenario in BPC PAK Unified or migrate existing BW-IP/PAK EDW model to BPC PAK unified as
described with upgrade path 4.
* Set up data communication between BPC Classic and BPC PAK unified according to business requirements.
Please let me know if you have any questions.
With Regards
Brahmareddy Kolli